The Hand-Off – Planning for Successful Transition from Construction to Operations

fmj-nov-dec-2016

As published in the Nov-Dec 2016 edition of IFMA’s FMJ. Consider this: A building is designed, constructed, and turned over to facilities in roughly eighteen to twenty-four months – often launched without adequate testing, training that does not fully prepare engineers, minimal operating parameters defined, and no comprehensive documentation on how to operate & maintain […]

Commissioning & Retro-Commissioning as published in IFMA’s FMJ

fmj-november-december-2015-cover 2

Lowering Utility Costs and Increasing Facility  Performance through Commissioning and Retro- Commissioning by John Rimer as published in the November/December issue of IFMA’s  Facility Management Journal Commissioning is one of the most cost-effective means of ensuring optimum building  performance and efficiency, returning energy savings as high as 25% and payback periods  measured in months.  However, […]